Turkey : Description of tanker from IMM – Current news

In a statement made by the IMM, it was noted that Şile Drinking Water Treatment Plant was built in 1994 with a daily capacity of 11 thousand cubic meters and the facility has continued to serve with this capacity for years.

In the statement stated that the population of chile has increased by 48 percent in the last 13 years only from 25 thousand to 37 thousand, ”The daily population of the district, which is a tourism region, reaches 1 million. For this reason, there is a water pressure problem in the upper elevations of Şile district, especially on Sundays in summer ”.

In a statement, one of the subsidiaries of İBB, İSKİ General Directorate has been working to find an urgent solution to this problem, “The water pressure problem will be resolved as soon as possible. İSKİ also accelerated the construction of an additional 20 thousand cubic meters / day treatment plant, which was tendered in 2018 for a permanent solution. The investment will be completed and put into operation at the end of this year. ”

PRESIDENT SHARED

AKP Istanbul Provincial President Bayram Şenocak and IMM Assembly AKP Group Deputy Tevfik Göksu accused CHP’s IMM administration by sharing photos of the citizens from their social media accounts while taking water from the tanker.